Skip to content
OCRVEmpire

Fleet and Commercial Body

Van and Truck Cargo Floor and Wall Liner Installation

Typical range

$400 to $4,500

Shop hours

2 to 18

Labor rate

$210/hr

The short answer

Cargo floor and liner installation covers plywood and composite flooring, aluminum tread plate, wall and door liners, and spray-on floor coatings in vans and bodies. Work runs $400 to $4,500, or 2 to 18 hours at $210 per hour plus materials. In shop install only.

01

What this work actually involves

The floor is the part of a cargo area that decides how long the rest of it lasts. Bare corrugated van floor traps water and grit in the valleys, and on a service van running Inland Empire job sites that mix grinds through the coating and starts corrosion you will not see until it is through the panel. A proper floor system fills the corrugation, gives a flat working surface, and gets sealed at the perimeter and at every fastener so water never gets underneath it in the first place. Getting that perimeter seal right is most of the value of the job.

Material choice follows the work. Plywood is cheap, easy to replace, and swells if it ever gets wet under a bad seal. Composite panel resists water entirely and costs more up front but tends to outlast two plywood floors. Aluminum tread plate is the right answer where pallet jacks, hand trucks, and dropped tooling would destroy anything softer, and it is the standard on beverage and food service bodies working docks all day. Spray-on liner from Line-X or Rhino Linings gives a bonded, seamless, non-slip surface with no seams to fail, and it is the best option on units where washdown matters.

Wall and door liners handle the other damage vector. Cargo shifting against bare van sheet metal dents it from the inside, and those dents show on the outside of a branded fleet vehicle. Liner panels take the abuse instead, and on wrapped or lettered vans that protection directly preserves the graphics you paid for. We fit liners to the platform, cut around existing anchors and E-track, and seal the panel edges. In shop body, paint, structural, and equipment install only. Engine, drivetrain, and DOT inspection work are not performed.

Systems and brands we work on: Line-X, Rhino Linings.

Location: All work is performed at our Yorba Linda facility. We do not offer mobile, roadside, or fleet route service.

02

What the job includes

  • Plywood and composite cargo floor fabrication, fitting, and installation
  • Aluminum tread plate flooring for pallet jack and hand truck duty
  • Spray-on bedliner floor coating with bonded seamless non-slip finish
  • Corrugation filling and subfloor leveling before the top surface goes down
  • Perimeter and fastener sealing so water cannot migrate under the floor
  • Wall liner panel installation in plywood, composite, and aluminum
  • Rear door and side door liner panels
  • Wheel well cover fabrication and installation
  • Cutouts and sealing around existing E-track, D-rings, and floor anchors
  • Removal and disposal of failed, rotted, or water-damaged existing flooring

03

When you need this service

  • A soft spot, delaminated edge, or visible swelling in an existing plywood floor
  • Standing water or grit trapped in the corrugation of a bare van floor
  • Rust visible through the cargo floor from inside the van
  • Dents appearing on the outside of a van body from cargo shifting inside
  • A worn-through or curled floor edge catching hand truck wheels
  • Slippery flooring in a van that gets loaded in wet conditions
  • Graphics or wrap damage on a panel that cargo repeatedly contacts

04

How we do it, step by step

  1. 01

    Existing floor assessment

    Old flooring pulled and the metal underneath inspected for corrosion and standing water damage. A new floor over a rotting substrate hides the problem instead of solving it.

  2. 02

    Corrosion treatment

    Any surface corrosion found under the old floor is treated and coated before new material goes down, because this access does not come back once the floor is in.

  3. 03

    Material selection

    Plywood, composite, aluminum tread, or spray-on chosen against the actual duty cycle. Pallet jack traffic and washdown requirements are the two factors that decide it.

  4. 04

    Template and cut

    Floor templated to the actual body including wheel wells, anchors, and door openings, then cut so the panel drops in without gaps at the perimeter.

  5. 05

    Fit, fasten, and seal

    Panels fastened to the floor structure with sealed fasteners and the entire perimeter sealed, so water cannot get under the floor and start corrosion from below.

  6. 06

    Wall and door liners

    Liner panels fitted and installed, cut around existing E-track and anchors, with edges sealed and trimmed so cargo cannot catch and peel a panel back.

  7. 07

    Coating and release

    Spray-on liner applied where specified and fully cured before the van is loaded, anchors and E-track verified accessible, and the finished cargo area photographed for your fleet build standard.

05

Pricing and posted rates

Pricing for Cargo Floor and Liner Installation
ItemRate or rangeNotes
Typical job range$400 to $4,500Varies with extent of damage and parts availability
Shop hours2 to 18Quoted after teardown, not before
Body and paint labor$210 per hour2026 posted rate
Paint supplies$55 per paint hourCalculated automatically on every estimate
Body supplies$5 per body hourCalculated automatically on every estimate
Parts100% markup under $100, 35% overSpecial order parts require a non refundable deposit at order
Deposit50% at authorization over $2,000Additional 25% when parts arrive on jobs over $10,000
Sales tax7.75% on parts and materialsLabor is not taxed

Insurance billed jobs may be billed at carrier negotiated labor rates that differ from the posted retail rates above. See all posted rates.

07

Vehicles we do this work on

08

Questions about cargo floor and liner installation

Frequently asked questions

What does cargo floor installation cost?

Work runs $400 to $4,500, or 2 to 18 hours at $210 per hour plus materials. A plywood floor in a standard cargo van sits at the low end. A composite or aluminum tread floor in a long wheelbase high roof van with wall liners, wheel well covers, and full corrosion treatment underneath sits at the high end. Materials over $100 carry 35 percent markup.

How long is the van tied up?

A plywood or composite floor is typically a one-day job. Add a day for wall and door liners. A spray-on bedliner floor requires prep, application, and cure, so plan two to three working days and note that the van cannot be loaded until the coating has fully cured. Corrosion treatment under an old rotted floor can add another day.

Plywood, composite, aluminum, or spray-on. Which is right?

Plywood is the cheapest and the easiest to replace, and it fails if water ever gets under it. Composite resists water and usually outlasts two plywood floors. Aluminum tread plate is what survives pallet jacks and hand trucks all day. Spray-on liner from Line-X or Rhino Linings is seamless and non-slip, which makes it the best choice where the van gets washed down.

Will a new floor fix the rust in my van?

Only if the corrosion is treated first, which is exactly why we pull the old floor and inspect the metal before quoting the new one. Covering active corrosion with fresh plywood buys you a year and a bigger repair. We treat and coat what we find, and if the floor pan itself has perforated, that becomes a panel repair before any new flooring goes in.

Can you do the flooring and the mechanical service at once?

No. In shop body, paint, structural, and equipment install only. Engine, drivetrain, or DOT inspection work is not performed at this facility. Flooring, liners, shelving, partitions, and body repair are what we do. Everything happens at our Yorba Linda facility, and we do not run route service or dispatch technicians to fleet yards.

09

Related services

10

More fleet and commercial body work

Ready to move on cargo floor and liner installation? Bring it to Yorba Linda.